OPER ATOR'S MANUALPOST HOLE DIGGERMAN0290 (Rev. 6/16/2006)Tested. Proven. Unbeatable.PHD25General Purpose 3-Point MountedFor 15 - 25 hp Tractorsw
10 OperationMAN0290 (Rev. 6/16/2006)Use stabilizer bars, adjustable sway chains, or swayblocks on your tractor lift arms to keep the post holedigger f
Operation 11MAN0290 (Rev. 6/16/2006)If you have difficulty penetrating hard ground, refer tothe Troubleshooting section in this manual for sugges-tion
12 OperationMAN0290 (Rev. 6/16/2006)SHEAR BOLT REPLACEMENT Never replace shear bolt or auger retaining boltwith a different length, or grade. Always
Owner Service 13MAN0290 (Rev. 6/16/2006)OWNER SERVICEThe information in this section is written for operatorswho possess basic mechanical skills. If y
14 Owner ServiceMAN0290 (Rev. 6/16/2006)Daily lubrication of the PTO slip joint is necessary. Fail-ure to maintain proper lubrication can result in da
Owner Service 15MAN0290 (Rev. 6/16/2006)CLEAN POST HOLE DIGGERAfter Each Use● Remove large debris such as clumps of dirt, grass,crop residue, etc. fro
16 TroubleshootingMAN0290 (Rev. 6/16/2006)TROUBLESHOOTINGPROBLEM POSSIBLE CAUSES & SOLUTIONAuger will not dig Shear bolt sheared – install new she
Troubleshooting 17MAN0290 (Rev. 6/16/2006)TROUBLESHOOTINGPROBLEM POSSIBLE CAUSES & SOLUTIONPTO driveline failure Operator raising post hole digger
18 AssemblyMAN0290 (Rev. 6/16/2006)ASSEMBLY INSTRUCTIONS Keep hands, feet, hair, and clothing away fromequipment while engine is running. Stay clear
Assembly 19MAN0290 (Rev. 6/16/2006)INSTALL SAFETY SHIELDS1. Place gearbox upside down on a suitable worksurface.2. Attach output shield (14), Figure 2
2 IntroductionGen’l (Rev. 6/6/2005)TO THE DEALER:Assembly and proper installation of this product is the responsibility of the Woods® dealer. Read man
20 AssemblyMAN0290 (Rev. 6/16/2006)INSTALL DRIVELINE Figure 4. Driveline Installation1. Clean input shaft on gearbox and smooth bore ofdriveline yoke.
Assembly 21MAN0290 (Rev. 6/16/2006)Cut Driveline1. Place driveline half in a padded vise and cut shieldoff at the determined length. Figure 6. Cut Shi
22 AssemblyMAN0290 (Rev. 6/16/2006)INSTALL PARKING STAND (OPTIONAL) Figure 9. Parking Stand Installation1. Remove auger from digger.2. Remove hardware
Assembly 23MAN0290 (Rev. 6/16/2006)Install Cylinder Clamps1. Make sure cylinder (11) is retracted.2. Place cylinder clamps (6, top) and (7, bottom)aro
24 Dealer Check ListMAN0290 (Rev. 6/16/2006)DEALER CHECK LISTSPRE-DELIVERY CHECK LIST(DEALER’S RESPONSIBILITY)Inspect digger thoroughly after assembly
Parts 25MAN0290 (Rev. 6/16/2006)PARTS INDEXPHD25 POST HOLE DIGGER ASSEMBLY. . . . . . . . . . . . . . . . . . . 26 - 27GEARBOX ASSEMBLY . . . . . . .
26 PartsMAN0290 (Rev. 6/16/2006)PHD25 POST HOLE DIGGER ASSEMBLY
Parts 27MAN0290 (Rev. 6/16/2006)PHD25 POST HOLE DIGGER ASSEMBLY PARTS LISTREF PART QTY DESCRIPTION110093381Boom assembly PHD25210093392A-Frame bar PHD
28 PartsMAN0290 (Rev. 6/16/2006)PHD25 GEARBOX ASSEMBLYREF PART QTY DESCRIPTION10093461Gearbox complete PHD25/351N/A1Snap ring, 72 x 75 x 2.52N/A8Washe
Parts 29MAN0290 (Rev. 6/16/2006)PHD25 DRIVELINE ASSEMBLYREF PART QTY DESCRIPTION10093491Driveline, complete110093741Yoke, complete w/ zerk210093752Cro
Introduction 3MAN0290 (Rev. 6/16/2006)TABLE OF CONTENTSINTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
30 PartsMAN0290 (Rev. 6/16/2006)PHD25 AUGER ASSEMBLYAUGER TOOTH MOUNTING PATTERNREF PART QTY DESCRIPTION1100930016" Single flight auger 30"
Parts 31MAN0290 (Rev. 6/16/2006)PHD25 DOWN PRESSURE KIT (OPTIONAL)REF PART QTY DESCRIPTION-10093361Down pressure kit110093612Plate, pivot down pressur
32 PartsMAN0290 (Rev. 6/16/2006)PHD25 PARKING STAND (OPTIONAL)REF PART QTY DESCRIPTION10093241Stand PHD25 digger (complete)110093271Hook, PTO stand210
Appendix 33Bolt Torque & Size Charts (Rev. 10/10/2005)BOLT TORQUE CHARTAlways tighten hardware to these values unless a different torque value or
34 AppendixBolt Torque & Size Charts (Rev. 10/10/2005)BOLT SIZE CHARTNOTE: Chart shows bolt thread sizes and corresponding head (wrench) sizes for
F-3079 (Rev. 5/2/2006)Woods Equipment Company2606 South Illinois Route 2 Post Office Box 1000Oregon, Illinois 61061 800-319-6637 tel800-399-6637 faxww
F-8494 (Rev. 6/23/2005)©2004 Woods Equipment Company. All rights reserved. WOODS, the Woods logo, and "Tested. Proven. Unbeatable." are trad
4 SafetyPHD SR (Rev. 6/16/2006)TRAINING Safety instructions are important! Read allattachment and power unit manuals; follow allsafety rules and safe
Safety 5PHD SR (Rev. 6/16/2006) Do not put digger into service unless all shieldsand guards are in place and in good condition.Replace if damaged. K
6 SafetyPHD SR (Rev. 6/16/2006)(Safety Rules continued from previous page) Never replace shear bolt or auger retaining boltwith a different length, o
Safety 7MAN0290 (Rev. 6/16/2006) Read Operator's Manual before operating, servicing, or repairing equipment. Follow all safety rules and instruc
8 SafetyMAN0290 (Rev. 6/16/2006)5 - PN 10093321 - PN 10093312 - PN 1009337
Operation 9MAN0290 (Rev. 6/16/2006)OPERATIONThe operator is responsible for the safe operation ofthe equipment. The operator must be properly trained.
Comentários a estes Manuais